Performance

Question: 

Is there a chart available on the allowable amount of deflection on floor trusses?

Question: 

Is it common practice for the supplier/distributor of a truss to provide a publication regarding temporary bracing with the delivery of the material?

Question: 

We have a customer that bought trusses in June. The trusses were shipped [ and one month later are] being set. The chords have weathered and bowed. What is the industry standard for dealing with this problem? What is our liability in this situation? We were not aware of any delays on the customer’s part and shipped as requested. Note: These trusses are 62 ft. scissor trusses.

Question: 

I need to obtain some information on fire-retardant-treated roof trusses.

Question: 

We have been using Turb-O-Webs for about four months. We are very happy with their performance, although there have been a few ripples along the way. The main thing that concerns me at present is the need for performance documentation and testing data. Do you have anything that will help, or know of people or organizations that could offer assistance?

Question: 

In RC 2601, is RC-1 Channel used?

Question: 

Has there been any research or studies on long-term deflection of metal plate connected wood trusses? How much deflection is allowed?

Question: 

I am looking for information on point loading trusses. We manufacture mounting structures for solar panels. Typically, 10 to 15 sq. ft. of solar panel is supported by one standoff. Under extreme conditions – 50 lbs. per sq. ft. of wind load - we can transfer 500 to 750 lbs. of force onto one point of one truss. Are there any standards on this issue?

Question: 

How long does it take the moisture content to stabilize in a wood truss? I live in southern California. Also, how much deflection should be expected in a scissors truss over a partition wall?

Question: 

I am thinking of using wood trusses for the roofing/ceiling structural systems on some houses I shall build. I remember, though, an engineer/volunteer fireman commenting back in 1989 that the connector plates are prone to expand and pop off, early on in a fire, causing catastrophic structural failure. Was this the case, and if so, has this problem been corrected?