Performance

Question: 

Is there a chart available on the allowable amount of deflection on floor trusses?

Question: 

Is it common practice for the supplier/distributor of a truss to provide a publication regarding temporary bracing with the delivery of the material?

Question: 

A condominium project I am involved with is experiencing a sound transfer problem through the floor/ceiling assembly between the first and second floor. You can hear every footstep, from an adult to a child. The floor assembly consists of a carpet and pad, 3/4 in. OSB sub-flooring, 15 in. deep wood trusses at 16 in. on center, 9 in. fiberglass batt insulation and a 5/8 in. gypsum board ceiling. The trusses span 20 ft. with air/heat ducts between the trusses. Will an additional layer of 5/8 in. gypsum board attached to 7/8 in.

Question: 

What is the correct method of attaching scissors trusses to the top plate? I read recently in a trade magazine that this type of truss should be toe-nailed on one end and attached with slotted clips on the other end. According to the article, this is to allow for movement of the truss. We require PE stamped spec sheets from the truss manufacturer to verify trusses meet wind and snow loads. These sheets give bracing requirements but never give recommended attachment requirements.

Question: 

Are there any schematics available on how to horizontally brace a 7/12 pitch roof?

Question: 

In RC 2601, is RC-1 Channel used?

Question: 

Has there been any research or studies on long-term deflection of metal plate connected wood trusses? How much deflection is allowed?

Question: 

I am looking for information on point loading trusses. We manufacture mounting structures for solar panels. Typically, 10 to 15 sq. ft. of solar panel is supported by one standoff. Under extreme conditions – 50 lbs. per sq. ft. of wind load - we can transfer 500 to 750 lbs. of force onto one point of one truss. Are there any standards on this issue?

Question: 

We have a customer that bought trusses in June. The trusses were shipped [ and one month later are] being set. The chords have weathered and bowed. What is the industry standard for dealing with this problem? What is our liability in this situation? We were not aware of any delays on the customer’s part and shipped as requested. Note: These trusses are 62 ft. scissor trusses.

Question: 

I need to obtain some information on fire-retardant-treated roof trusses.