Question: 

As the owner for a building designed to have metal plate wood trusses, what documentation should I receive to be assured that the manufactured wood trusses delivered to the site have indeed been manufactured at a licensed and registered wood truss manufacturer under the required written quality control procedures?

Question: 

I was wondering if you have any information or anecdotes relating to the deflection performance of long span scissors trusses? We recently sold a job with 70 ft. long scissors trusses. The customer is in the process of installing the trusses and doesn't like the deflections he is seeing. To make matters worse, the scissors trusses are framing into a valley set (which we provided) that is erected on 35 ft. Howe trusses. The Howe trusses are exhibiting very little deflection. Any ideas?

Question: 

Is it common practice for the supplier/distributor of a truss to provide a publication regarding temporary bracing with the delivery of the material?

Question: 

The truss industry maintains that the design of truss roof and floor system permanent bracing is the responsibility of the building designer. System permanent bracing covers the entire structure and all bracing element interactions.

Question: 

Is it the responsibility of the truss manufacturer to provide a sealed layout drawing for roof trusses?

Question: 

When you’re selling trusses through a lumberyard and the contractor calls to say that the “trusses don't fit correctly,” who has the ultimate responsibility for the trusses? I argue that the lumberyard is responsible since we have provided them with all the information on how the job was designed, even though they may or may not have passed this information on to the contractor.

Question: 

My company supplied roof trusses for a hotel project. The building inspector shut the project down because the trusses were not designed to account for additional snowdrift loading. The construction plans did not contain any snowdrift loading information. The architect is claiming it is our responsibility to determine drift loading, therefore we must fix the problem. Do you have any documentation to help us dispute the architect’s claim?

Question: 

I am looking for strongback bracing requirements for a 12 in. deep residential floor system with trusses in lengths up to 19 ft. Can the strongback bracing end at a truss without tying into an end wall? For instance, can three trusses of a type be tied together by strongbacks, then the next series of different trusses be tied together without having to be tied back to the previous type of trusses?

Question: 

What are the requirements for installing valley sets over roof trusses? I am interested in nailing and support conditions. Some engineers ask for the bottom chord of the valley truss to be ripped to match the roof pitch of the underlying trusses. Is this necessary? How can I calculate values for uplift resistance for the building inspector?

Question: 

Are there any associations that have recommendations for the installation of wood trusses?