Question: 

I am a building inspector and I have a question on information provided on truss design drawings. What does the uplift reaction number represent? Some manufacturers are very specific and state “to provide for mechanical connection of the truss to the top plate with a connector capable of withstanding a specific load.” Others simply list the uplift reaction with no further information. These are the ones that have caused a debate as to what the number actually represents.

Question: 

I have mono trusses on either side of a firewall. I have the fire rating/wall material between them. Can I place a ridge vent above these two? Or should I use vents? How do I calculate the appropriate vent sizes and styles?

Question: 

Are wood trusses designed to be fall protection anchors that would support a worker should he fall?

Question: 

What is the industry standard for ordering residential roof truss systems: Should the general contractor/builder field measure before ordering trusses or should he rely on the blueprint? Who is responsible for their accuracy – the plan service, the truss manufacturer, the builder/general contractor or the framing contractor?

Question: 

What are the requirements for installing “valley set” overlay roof trusses? I am interested in nailing and support conditions. Some engineers ask for the bottom chord of the valley truss to be ripped to match the roof pitch of the underlying trusses. Is this necessary?

Question: 

What are the requirements on the permanent bracing of bottom chords? Can gypsum board diaphragms be used?

Question: 

We are concerned with SBCA’s BCSI-B1 Summary Sheet which under “Notes” makes a disclaimer. Our concern is if there would be an accident with our trusses and we point out that the bracing was not placed correctly according to SBCA documentation, which is sent with every job. If the accident goes to court, how will our attorney respond when the opposing attorney points out the disclaimer, which infers that the bracing we recommend must be flawed, otherwise it would not be disclaimed?

This presentation provides information on truss submittal packages.

In order to promote the safe installation of building components including trusses, manufacturers send out a Jobsite Package to the construction site with the truss delivery. These Jobsite Packages include the Truss Submittal Package. The Truss Submittal Package includes the information that if required will be submitted to the Contractor/Building Designer, who if required will submit it to the local building official.

Woodhaven designed and built the roof and floor trusses for the Spruce Street Shul. Woodhaven also supplied the lumber and hardware for the project.