Question: 

Is it possible to attach deck ledger boards to the ends of floor trusses? If not, are there any modifications that would make this possible?

Question: 

Do you have any information on the use of in-floor radiant heat with 4x2 open-web floor trusses? Are there any adverse effects to the lumber as a result of moisture build up?

Question: 

What is the industry standard for ordering residential roof truss systems: Should the general contractor/builder field measure before ordering trusses or should he rely on the blueprint? Who is responsible for their accuracy – the plan service, the truss manufacturer, the builder/general contractor or the framing contractor?

Question: 

Are wood trusses designed to be fall protection anchors that would support a worker should he fall?

Question: 

I'm trying to find out who the truss manufacturer was that built the trusses in my home. I was told that there is usually a stamp on the side of the bottom chord. All I found was “2400F 2.0E.” What am I looking for? The other chords only have material stamps. Can you tell me what kind of information I should be looking for to find out who the manufacturer was?

Question: 

If you have the condition where you are out by the max tolerances of 1/2 in., how do you correct the situation? Do you shim the truss from the bottom? Shim from the top? I will assume you do not shave the truss off. What is the published corrective action for situations that cannot handle the variation in truss height?

Question: 

We are looking into developing the attic space above our garage into a media room. The garage is attached to the home and we would enter this area from the living room. We recently read if you have a truss system that in order to develop the attic, one would have to replace the entire roof with conventional construction. My question is: can we safely develop this trussed area above our garage?

Question: 

I am a building designer on a salt storage building project. I would like to use metal plate connected wood trusses in the design. What should I specify for the metal connector plates?

Question: 

We are concerned with SBCA’s BCSI-B1 Summary Sheet which under “Notes” makes a disclaimer. Our concern is if there would be an accident with our trusses and we point out that the bracing was not placed correctly according to SBCA documentation, which is sent with every job. If the accident goes to court, how will our attorney respond when the opposing attorney points out the disclaimer, which infers that the bracing we recommend must be flawed, otherwise it would not be disclaimed?

Question: 

We keep having problems with dry wall joints raising on the vaulted bottom chords in the track homes that we are building. The joints run from front to back of the house and the trusses bear on the side walls. The trusses are mostly 2-point bearing (a few in the front and back of the building are tri-bearing). The trusses span 40 ft. and have a 4/12 pitch with a tile roof. Is it common to have dry wall problems as the trusses deflect? How long should the roof be loaded before hanging sheetrock? Should the heel of the truss be allowed to slide out on the top plate?