Question: 

We are experiencing problems with bouncy wood floor trusses. I'm wondering what the industry standard is on deflections (live and total load). Also, do you have any ideas on how to decrease the deflection without affecting the profit margin significantly?

Question: 

I have mono trusses on either side of a firewall. I have the fire rating/wall material between them. Can I place a ridge vent above these two? Or should I use vents? How do I calculate the appropriate vent sizes and styles?

Question: 

Is there a general rule of thumb to follow on chase placement within a top-chord bearing floor truss? In other words, how close to the bearing point of the truss can the chase occur?

Question: 

In truss manufacturing, can hemlock, fir and spruce be used instead of Douglas Fir/Larch? What grades can be used: Structural Light Framing (Select Structural through #3) only, or Light Framing (Construction through Utility) as well?

Question: 

Can a roof truss penetrate a one-hr. tenant separation wall without having a one-hr. rated ceiling? The building official insists that the 2x4 chords are combustible and nullify the integrity of the one-hr. rated partition that is constructed in an attic above an 8 in. C.M.U. bearing wall. The partition consists of gypsum board attached to 2 x 4 stud framing. The building official insists that a ledger must be attached through the gypsum board to support the trusses each side of the wall. This is almost saying that any rated assembly must have bearing only on other rated assemblies.

Question: 

How long has the truss industry been around and where did it start?

Question: 

As the owner for a building designed to have metal plate wood trusses, what documentation should I receive to be assured that the manufactured wood trusses delivered to the site have indeed been manufactured at a licensed and registered wood truss manufacturer under the required written quality control procedures?

Question: 

I'm trying to find out who the truss manufacturer was that built the trusses in my home. I was told that there is usually a stamp on the side of the bottom chord. All I found was “2400F 2.0E.” What am I looking for? The other chords only have material stamps. Can you tell me what kind of information I should be looking for to find out who the manufacturer was?

Question: 

Consider this statement from a set of construction contract documents: “The Truss Manufacturer is responsible for inspecting the truss installation, bracing, anchorage and bearings and preparing a letter of verification stating that trusses are installed and braced properly.” At first glance, it may seem that the truss manufacturer is the most logical party to perform such an inspection. They are the truss experts, are they not?

Question: 

We have a local builder wishing to use floor trusses with a 2-hour assembly. I have shown him the 2-hour design on pages 17-27 of the second edition of SBCA’s Metal Plate Connected Wood Truss Handbook. Is this assembly UL approved? If so, what is the design number?