Question: 

I installed roof trusses in my house and dry walled the ceiling to the bottom of the trusses. Now I seem to have a problem with the change of the seasons. Where the ceiling meets the interior wall, a gap opens and closes – in winter it opens, in summer it closes. What did I do wrong, how can I correct it and how should the drywall be installed in the first place?

Question: 

It is critical that permanent top chord bracing is supplied by proper nailing of the valley truss bottom chords to the carrying truss top chords, through purlins or properly installed rated roof sheathing. If the sheathing is not carried through under the valley framing, then the permanent top chord bracing must be supplied in another manner.

Question: 

I am looking for strongback bracing requirements for a 12 in. deep residential floor system with trusses in lengths up to 19 ft. Can the strongback bracing end at a truss without tying into an end wall? For instance, can three trusses of a type be tied together by strongbacks, then the next series of different trusses be tied together without having to be tied back to the previous type of trusses?

Question: 

How do I, as a truss manufacturer, adequately advise my customer against the dangers of 60 ft. and over truss span installations?

Question: 

Is lag bolting the bottom chord of a truss to the top plate of a wall a proper fix to correct truss arching, assuming the attic is properly vented?

Question: 

What is the correct method of attaching scissors trusses to the top plate? I read recently in a trade magazine that this type of truss should be toe-nailed on one end and attached with slotted clips on the other end. According to the article, this is to allow for movement of the truss. We require PE stamped spec sheets from the truss manufacturer to verify trusses meet wind and snow loads. These sheets give bracing requirements but never give recommended attachment requirements.

Question: 

If you use hurricane clips to secure roof trusses from uplift, are you allowed to use fewer than the typical three nails in the bearing heel of the roof truss? I am concerned because we want to do the right fastening schedule, but three nails in addition to the hurricane clip splits the wood. What is the standard recommendation?

Question: 

I have a four-year-old house with glued open-web trusses. Both the truss manufacturer and the builder have admitted to me that the trusses were installed wrong. I have a problem with the suggested repair. I have hired a structural engineer and he suggested installing a 2x10 between each truss and removing the old truss. This would have to take place on both the first and second floors because all the trusses were installed wrong. The manufacturers want to install six strongbacks on each floor, hoping this will tighten them up.

Question: 

We have a local builder wishing to use floor trusses with a 2-hour assembly. I have shown him the 2-hour design on pages 17-27 of the second edition of SBCA’s Metal Plate Connected Wood Truss Handbook. Is this assembly UL approved? If so, what is the design number?

Question: 

What type of construction uses a fire cut truss? Could you describe a fire cut truss?