Installation Best Practices

Question: 

What is the correct method of attaching scissors trusses to the top plate? I read recently in a trade magazine that this type of truss should be toe-nailed on one end and attached with slotted clips on the other end. According to the article, this is to allow for movement of the truss. We require PE stamped spec sheets from the truss manufacturer to verify trusses meet wind and snow loads. These sheets give bracing requirements but never give recommended attachment requirements.

Question: 

I am trying to develop a guideline for my firefighters regarding initial fire attack in buildings with light-weight trusses. My concern is truss failure, especially when exposed to fire. Is there any information on failure time related to flame impingement? Any information about truss failure – especially in a fire condition would be helpful.

Question: 

I have mono trusses on either side of a firewall. I have the fire rating/wall material between them. Can I place a ridge vent above these two? Or should I use vents? How do I calculate the appropriate vent sizes and styles?

Question: 

Does the NFPA sprinkler standard address sprinkler loading? If so, how and where do I buy it? What other information do you have on sprinkler loading? How do other truss companies price jobs for sprinkler loading the plans do not include a sprinkler layout or even say what size/type of sprinkler system will be used?

Question: 

What are the requirements on the permanent bracing of bottom chords? Can gypsum board diaphragms be used?

Question: 

The Gypsum Association “Fire Resistance Design Manual” (GA-600-12) lists file RC2601 with two layers of 5/8 in. gypsum wallboard (GWB) on wood joists.

Question: 

I am a building inspector and have some questions regarding how to apply IBC 2012 2308.8.5 (IRC 2012 R802.8) (similar IBC 2015 2308.4.6 & IRC 2015 R802.8) to trusses, especially those with high heels:

Question: 

I have recently heard of a problem with fire-retardant-treated wood (FRTW) trusses that were manufactured and installed in 1965-1980. I was searching for more information, since my job involves the protection of property in our member school districts. I had heard that the trusses make of FRTW during that time period can or will become corrosive to the hardware and the trusses will fail.

Question: 

What are the requirements for installing valley sets over roof trusses? I am interested in nailing and support conditions. Some engineers ask for the bottom chord of the valley truss to be ripped to match the roof pitch of the underlying trusses. Is this necessary? How can I calculate values for uplift resistance for the building inspector?

Question: 

I was wondering if you have any information or anecdotes relating to the deflection performance of long span scissors trusses? We recently sold a job with 70 ft. long scissors trusses. The customer is in the process of installing the trusses and doesn't like the deflections he is seeing. To make matters worse, the scissors trusses are framing into a valley set (which we provided) that is erected on 35 ft. Howe trusses. The Howe trusses are exhibiting very little deflection. Any ideas?