Question: 

If trusses blew down from insufficient temporary bracing and the contractor put them back up without the knowledge of the truss manufacturer and gave the truss manufacturer a letter stating that the trusses were okay, is that sufficient? Do you know of any truss manufacturer who would accept this?

Question: 

I am installing a 40-foot scissor truss that is designed to deflect about ½ inch. I am concerned that the deflection will cause an interior partition wall to pick up some load from the truss and transfer it to the floor system. Should I double up the I-joists under this partition to pick up the extra load?

Question: 

I am a truss manufacturer in an area of the country that often has some pretty severe winters. It concerns me how little some of the local builders seem to know about snow load design. What are some of the things that need to be considered?

Question: 

I am a structural engineer designing pool cage structures that are typically attached to the house at the fascia board. Sometimes, the structure is attached where trusses are behind the fascia board and other times there is a framed gable end overhang. Do you know of any information concerning this additional load on the trusses or overhang under design wind loads? Is there a limiting distance on the amount of overhang? I know trusses are designed for certain uplift and the pool cage will add to this uplift at design load, but what about the gable end overhangs?

Question: 

Are there any trusses that are supported strictly by the wood itself without any mechanical connections such as brackets?

Question: 

I am remodeling a 16-year-old ranch style home. The roof consists of 4/12 26 ft. span trusses, 24 in. O.C., over 2x4 stud walls. What is the recommended means of affixing the top plate of new interior partitions to provide the lateral support needed for the partition? Also, I want to hang a soffit above and overhanging the new kitchen cabinets (recessed lighting placed within). What is the recommended means of attaching the soffit to the underside of the trusses so as not to interfere with the designed movement of the trusses under the variable live load experienced (snow load)?

Question: 

The industry suggests notching the gable end truss to support the overhang. Is this wise? What about a structural gable, or a gable designed with drag loads, or one with only partial bearing? How safe is it for a framer working with a truss that has the top chord cut repeatedly?

Question: 

The truss industry maintains that the design of truss roof and floor system permanent bracing is the responsibility of the building designer. System permanent bracing covers the entire structure and all bracing element interactions.

Question: 

In a small scale multi-family residential project, I'd like to use a wood truss floor-ceiling assembly to achieve a one hour separation between units. I'd like to directly attach the drywall to the underside of the trusses & use the truss space for ducts & lighting (the floor above will be lightweight concrete on plywood sub-floor). UL assemblies do not seem to address the duct/light penetrations in such an assembly. Can I achieve a one-hour rating in such an assembly and how are penetrations addressed? Can the ducts in the truss space serve both units above and below?

Question: 

We are finding it difficult to design permanent diagonal bracing for scissors trusses. The truss is often only a few feet in depth, which does not provide adequate room for diagonal bracing. Has SBCA come up with recommendations for permanent bracing of scissors trusses?