Construction

For decades, SBCA Jobsite Packages have helped component manufacturers (CMs) provide handling and installation guidance to their customers with every order. These pre-assembled packages of instruction documents, attached to truss deliveries in a zippered plastic bag, are now available in a digital format.

When Mandere Construction couldn’t get the trusses it needed to frame its projects, owner John Mandere went looking for the best truss folks he could find—and hired them

Your company does it every day: load components and deliver them to jobsites. Ben Vadnais, assistant plant manager at Windsor Building Systems, has a few tips for keeping your loading and delivery operations running as smoothly and safely as possible.

If you’ve been in the truss industry for any length of time, there’s one phone call you absolutely dread receiving: “We have a problem; your trusses collapsed!”

SBCA’s library of technical design and installation best practices has been expanded over the past year to help CMs navigate a wide array of code-related challenges in their markets.

The QuickTie System is a roof and wall anchoring system consisting of wire rope and threaded studs swaged to each end. One of the threaded studs is embedded into cured concrete by inserting it into a predrilled hole and using epoxy adhesive to anchor it to the foundation. The opposite end of the wire rope with the threaded stud is extended vertically to the uppermost top of the masonry wall, inserted through a hole drilled through the wood top plate(s), and attached to a steel plate and nut that are placed on top of the top plates(s).

Question: 

In a hip roof application where jack trusses connect to a girder truss using pressure blocking (power blocking), what is the proper installation and the span that is acceptable before a hanger is required?

Question: 

I have just moved into a new home and during the construction I noticed that one of the trusses in the garage was damaged. The web plate had come off in two different locations. I notified the builder and they said they would take care of it. Approximately two weeks after I moved in, I noticed the ceiling in the garage started to sag, so I went into the space above the garage and found the truss was never repaired. I again notified the builder and they sent someone to fix it. I went and looked at the fix and this is where my question comes in.

Question: 

How do trussed roofs perform in long-term service? Are there any reports of rusting in the nail plates, rot/insect attack, do-it-yourself modifications, or condensation and ventilation problems in the attic?

Question: 

The Gypsum Association “Fire Resistance Design Manual” (GA-600-12) lists file RC2601 with two layers of 5/8 in. gypsum wallboard (GWB) on wood joists.