Search
Article
2009 March
- BCMC is the one time each year exhibitors have the attention of component manufacturers from around the world in one place!
- Don’t miss BCMC this year; 2009 is one of the most pivotal years in our history.
- Exhibitors’ goals should be to have attendees thinking about your product or service long after they have returned home.
Article
2009 March
- Tri-County Truss decided to seek a special OSHA safety status by teaming up with a Washington state agency to make its operations safer.
- The company earned the VPP award in 2008 by empowering its workers.
- As part of the process, inspectors interviewed 45 employees at random behind closed doors about the company’s safety practices.
Article
2009 March
- FSC-certified lumber is not worth the two points available for its use since it isn’t a requirement that must be met for certification in LEED for Homes.
- Typically, homes that qualify for green certifications tend to be high performance, design-driven projects.
- LEED credits can be divided into “direct” credits and “indirect” credits, and components contribute to both.
Article
2009 April
- The performance of shear walls under lateral loads was recently tested in a full-scale assembly in SBCRI.
- The tests yielded results that are consistent with similar testing done by NAHB RC and APA.
- The test data calls into question prescriptive requirements of braced wall lines in the IRC.
Article
2009 May
- Historic All Saint’s Church in Stuart, IA burned in 1995, and was rebuilt with building components in 2008.
- The project team included SBCA member Lumber Specialties, who designed and built an intricate roof truss system for the main dome of the church.
- To properly transfer loads, the trusses tied into custom steel compression and tension rings placed in the center of the dome.
Article
2009 May
- Initially planned to be a design-bid-build project, the bid for a new city hall building for Star, ID, came in at $800,000 over budget.
- Performance Engineers, who provided value engineering services, helped to bring the project back within its $1.4 million budget.
- Synergy between the engineering firm, the component manufacturer and framing company further reduced costs by streamlining communication.
Article
2009 August
How recasting a bottleneck can add green to your bottom line
Article
2009 August
What you should know before you buy used
Article
2009 November
Article
2009 December