Several of the three-minute videos in this library are separated into two audience categories: “builder customer” and “framer customer.” The code required to embed the video on your company’s website is provided with each video below. Review the Toolbox Guidance Documents to explore how these videos can be used to promote specific products or your overall marketing campaign in conjunction with other CM Toolbox materials.
After the two homes were fully framed and dried-in, the thousands of images collected were analyzed to determine the man-hours it took to complete each discreet framing task and how much waste was generated in the process. The results of the Framing the American Dream study are conclusive: The component-framed house required 152.1 man-hours to complete, whereas the stick-framed house required 373.5 hours. It took two and half-times longer to construct the stick-framed version of the floorplan.
Background:
R501.3 (IRC-12) or R302.13 (IRC-15) states the following – “Floor assemblies….shall be provided with a 1/2-inch (12.7 mm) gypsum wallboard membrane…… or equivalent…….
SBCA has compiled the articles below to provide a comprehensive guide to the information it has published on R501.3 (from the 2012 IRC) and R302.12 (the same language incorporated in the 2015 IRC). The goal in organizing the information in this way is to enable the reader to fully understand this issue and SBCA’s position.
Question: Why was the IRC changed to provide a 2x10 exclusion from the requirement in R501.3/R302.13 that states, “Floor assemblies….shall be provided with a 1/2-inch (12.7 mm) gypsum wallboard membrane”?
The following provides SBCA's proposed best practice contract language for CMs to use as a standardize approach with respect to defining their scope of work. The grey highlighted text ties most directly to the commentary provided after the proposed sample language.
Proposed Sample Contract Language
The following provides SBCA's proposed best practice truss submittal package language for CMs to use as a standardize approach with respect to defining their scope of work. The grey highlighted text ties most directly to the commentary provided after the proposed sample language.
Proposed Sample TDD and TPD Submittal Transmittal Language
The following article provides SBCA's proposed best practice Truss Design Drawing (TDD) Cover Sheet language for CMs to use as a standardize approach with respect to defining their scope of work. The grey highlighted text ties most directly to the commentary provided after the proposed sample language.
Proposed Sample TDD Cover Sheet Language
The following article provides SBCA's proposed best practice Truss Design Drawing (TDD) warning note language for CMs to use as a standardize approach with respect to defining their scope of work.
Proposed Sample TDD Warning Note Language
The following article provides SBCA's proposed best practice Truss Placement Diagram note language for CMsto use as a standardize approach with respect to defining their scope of work.
Proposed Sample TPD Note Language
At the recent July SBCA Open Quarterly Meeting (OQM) in Madison, WI, the membership discussed the importance of raw material design values and their impact on component manufacturers (CM).
As noted in the following three articles:
The SBCA Truss Plate Council, Executive Committee and Board of Directors have been working on individual sample best practice language for component manufacturers. They are as follows:
SBCA's Design Software policy makes it clear the software and intellectual property should reside in the hands of the CM. Originally passed in 2002, the plate suppliers in attendance (Eagle, Alpine, MiTek and Simpson) all reiterated their unequivocal support for this policy and pledged to continue monitoring the use of its software and resolving instances where the software may be used contrary to this policy.