CM Toolkit Search
Several of the three-minute videos in this library are separated into two audience categories: “builder customer” and “framer customer.” The code required to embed the video on your company’s website is provided with each video below. Review the Toolbox Guidance Documents to explore how these videos can be used to promote specific products or your overall marketing campaign in conjunction with other CM Toolbox materials.
Form I-9 Audits
This information is intended to help employers understand their responsibilities regarding the I-9, how to conduct a self-audit, and how to prepare and respond to an HSI audit.
Connections - Truss to Truss
Per ANSI/TPI 1, truss-to-truss connections are under the scope of work of the truss designer. All other connections between a truss and another structural member (i.e. a wall or foundation) are the responsibility of the building designer.
Fall Protection
The Occupational Safety and Health Administration (OSHA) regulates fall protection procedures for residential construction jobsites under 29 CFR 1926 Subpart M. These statutes provide minimum requirements for the mitigation of fall risks during erection.
Temporary Bracing
During component installation, temporary restraint/bracing provides stability against unintended movement or loading prior to the application of exterior sheathing. Structural components are designed to withstand loading conditions over the course of the life of the structure under normal use conditions. However, during construction, insufficient temporary restraint/bracing may lead instability and even collapse under certain conditions such as high winds or seismic events. The resources below provide guidance on issues pertaining to the application of temporary restraint/bracing.
Permanent Bracing and Lateral Restraint
Permanent bracing and continuous lateral restraint is sometimes required within trussed systems to provide long-term stability and/or lateral force resistance. Individual structural components are designed to withstand loading conditions within a particular plane, so there are instances where the building designer may specify the use of permanent building stability bracing.
Quality Control - In-Plant
ANSI/TPI 1 Chapter 3 covers quality standards for the manufacture of metal plate connected wood trusses. It requires the use of a manufacturing quality assurance procedure, and period auditing by an approved inspection agency where required by local jurisdiction.
Fire Performance - Sprinklers
SBCA supports universal building installation of sprinklers for all types of construction, provided they are cost effective and do not create a competitive advantage for one structural element over another. When it comes to properly locating and designing sprinklers within a building, the IBC and IRC reference NFPA 13, 13D, and 13R (depending on the type of building). The resources below will assist the designer in understanding and implementing sprinkler systems in accordance with applicable building codes and referenced fire protection standards.