Design Documents

Question: 

It is critical that permanent top chord bracing is supplied by proper nailing of the valley truss bottom chords to the carrying truss top chords, through purlins or properly installed rated roof sheathing. If the sheathing is not carried through under the valley framing, then the permanent top chord bracing must be supplied in another manner.

Question: 

If trusses blew down from insufficient temporary bracing and the contractor put them back up without the knowledge of the truss manufacturer and gave the truss manufacturer a letter stating that the trusses were okay, is that sufficient? Do you know of any truss manufacturer who would accept this?

Question: 

A question has come up concerning sloped roof trusses and fire assembly ratings. Some are reluctant to rely on test results from flat (parallel chord) trusses applied to sloped roof trusses. Do you have any information regarding the suitability of the fire rated ceiling assemblies for sloped roof trusses? Does the “minimum depth” requirement of the parallel chord assembly apply to the minimum depth of a sloped roof truss (i.e., heel height?)

Question: 

What are the qualifications (if any) required to be considered a truss technician?

Question: 

I am a truss manufacturer in an area of the country that often has some pretty severe winters. It concerns me how little some of the local builders seem to know about snow load design. What are some of the things that need to be considered?

Question: 

How do you evaluate whether a metal plate connected truss is still usable after exposure to fire? Are there any recommended tests?

Question: 

What is the industry standard for ordering residential roof truss systems: Should the general contractor/builder field measure before ordering trusses or should he rely on the blueprint? Who is responsible for their accuracy – the plan service, the truss manufacturer, the builder/general contractor or the framing contractor?

Question: 

The Gypsum Association “Fire Resistance Design Manual” (GA-600-12) lists file RC2601 with two layers of 5/8 in. gypsum wallboard (GWB) on wood joists.

Question: 

Are there any published studies or guidelines on the fire rating of floor trusses built with 2x3 lumber?

Question: 

What are the requirements for installing valley sets over roof trusses? I am interested in nailing and support conditions. Some engineers ask for the bottom chord of the valley truss to be ripped to match the roof pitch of the underlying trusses. Is this necessary? How can I calculate values for uplift resistance for the building inspector?