Question: 

The truss industry maintains that the design of truss roof and floor system permanent bracing is the responsibility of the building designer. System permanent bracing covers the entire structure and all bracing element interactions.

Question: 

In a small scale multi-family residential project, I'd like to use a wood truss floor-ceiling assembly to achieve a one hour separation between units. I'd like to directly attach the drywall to the underside of the trusses & use the truss space for ducts & lighting (the floor above will be lightweight concrete on plywood sub-floor). UL assemblies do not seem to address the duct/light penetrations in such an assembly. Can I achieve a one-hour rating in such an assembly and how are penetrations addressed? Can the ducts in the truss space serve both units above and below?

Question: 

We are finding it difficult to design permanent diagonal bracing for scissors trusses. The truss is often only a few feet in depth, which does not provide adequate room for diagonal bracing. Has SBCA come up with recommendations for permanent bracing of scissors trusses?

Question: 

Our home caught fire last month and burned partly through a tongue and groove ceiling to the trusses. Some are charred. Our contractor did a moisture meter test. An engineer for the insurance company said the trusses were only smoke damaged & the moisture meter test is invalid (it can be set to read anything). I found one article on charred trusses, but it’s pretty vague. We do not feel safe with the insurance engineer’s assessment because some of the trusses are obviously charred. We hired an engineer who agreed with us.

Question: 

I own and live in the middle unit of a one-story tri-plex that has a truss-framed roof. The interior has high ceilings that would potentially allow the addition of a second floor room. I am contemplating adding a shed dormer to create a second story bedroom. Do you have any suggestions as to how a shed dormer could be added? I am familiar with how to frame up a shed dormer if the original framing were rafters and a ridge board, but the truss construction has thrown me for a loop.

Question: 

Some truss lumber repair nailing patterns call for 16d common nails. Most nail guns do not support 16d nails, but have an equivalent to a 12/10d nail. Is there a substitution guide or ESR report that could help us?

Question: 

Can you explain drag loads and how to calculate a drag load pertaining to roof trusses?

Dan Morris—a field service engineer at Apex Technology—and Kelly LaBlance—a technical manager with Builders FirstSource—are both convinced that developing and maintaining a design QC process has helped their companies. Their expertise in analyzing designs and finding creative solutions to solve or even prevent problems was on display as they guided BCMC attendees through common design mistakes and the issues they cause in the field. 

Long span trusses can pose significant risk to installers. The dimensions and weight of a long span truss can create instability, buckling and collapse of one or many trusses, if not handled, installed, restrained and braced properly. As such, they require more detailed safety and handling measures than shorter span trusses. This research report provides guidelines for proper handling and installation of long span trusses for both wood and cold-formed steel.

Drywall cracking and ridging are typical problems seen in ceilings and walls of homes. Sometimes, both of these issues appear at the same location, with cracking appearing in wetter months and ridging in drier months. This problem has become more widespread as homeowners insist on larger rooms and open floor plans that have large clear span areas. This Research Report evaluates local environment changes that play a significant role in every gypsum ridging and cracking case.