Installation Best Practices

Question: 

In a hip roof application where jack trusses connect to a girder truss using pressure blocking (power blocking), what is the proper installation and the span that is acceptable before a hanger is required?

Question: 

Are there any published studies or guidelines on the fire rating of floor trusses built with 2x3 lumber?

Question: 

What type of construction uses a fire cut truss? Could you describe a fire cut truss?

Question: 

Can a roof truss penetrate a one-hr. tenant separation wall without having a one-hr. rated ceiling? The building official insists that the 2x4 chords are combustible and nullify the integrity of the one-hr. rated partition that is constructed in an attic above an 8 in. C.M.U. bearing wall. The partition consists of gypsum board attached to 2 x 4 stud framing. The building official insists that a ledger must be attached through the gypsum board to support the trusses each side of the wall. This is almost saying that any rated assembly must have bearing only on other rated assemblies.

Question: 

Is it possible to construct an assembly for ceiling between first and second floors using 2x with few layers of gypsum to obtain a 3-hour fire rating?

Question: 

How do you evaluate whether a metal plate connected truss is still usable after exposure to fire? Are there any recommended tests?

Question: 

I am installing a 40-foot scissor truss that is designed to deflect about ½ inch. I am concerned that the deflection will cause an interior partition wall to pick up some load from the truss and transfer it to the floor system. Should I double up the I-joists under this partition to pick up the extra load?

Question: 

I am remodeling a 16-year-old ranch style home. The roof consists of 4/12 26 ft. span trusses, 24 in. O.C., over 2x4 stud walls. What is the recommended means of affixing the top plate of new interior partitions to provide the lateral support needed for the partition? Also, I want to hang a soffit above and overhanging the new kitchen cabinets (recessed lighting placed within). What is the recommended means of attaching the soffit to the underside of the trusses so as not to interfere with the designed movement of the trusses under the variable live load experienced (snow load)?

Question: 

If trusses blew down from insufficient temporary bracing and the contractor put them back up without the knowledge of the truss manufacturer and gave the truss manufacturer a letter stating that the trusses were okay, is that sufficient? Do you know of any truss manufacturer who would accept this?

Question: 

How important is continuous lateral bracing in roof trusses? Is it detrimental to the roof integrity if it is missing?